New College signage is installed. B2 is refurbished into a food technology room. Junior outdoor learning area is refurbished. A10 is refurbished into an art room. B1 is refurbished into a woodwork room.
![](https://acc.nt.edu.au/wp-content/uploads/sites/3/2022/03/Transition-5-300x200.jpg)
Uncategorised
News headline three
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.